Kehewin's Blatchford urban reserve proposal and potential options for a win/win scenario
Selling the land below market costs Blatchford money. How much depends on how fast the City actually sells land, and better terms can turn the cost into a gain.
Full results and sources
Tap a section to open it. Sources are in section 12.
1Every option side by sideEach option against the City selling the land, at both sales paces.
The top two rows are Kehewin's two offers. The rest are what-ifs with better terms. Each marker is one set of numbers about how fast the City sells land and how much of the price it keeps. Right of the line, the City does better than selling the land itself.
Plus: better for the City than selling the land. Minus: worse. Over the years chosen, in today's dollars.
2What each side getsLand, homes, money and buildings for the City and for Kehewin.
- Land
- 10.75 ha sold to builders. Roads (2.65 ha) and park (1.02 ha) make up the rest of the 14.42 ha.
- Homes
- 2,132, for about 3,750 people. That's about 185 homes per hectare of building land.
- Shops, offices, hotel
- In the Market District
- What the City gets
- The sale price, about $46.2M at today's asking prices, minus what it spends on roads and pipes. Then property tax once the buildings are up.
- How fast
- The City's 2022 plan was 6 ha a year, finished by 2042. Sales started in 2019. The City Auditor found it sold 3.3 ha a year from 2019 to 2023, or 1.1 ha a year if you leave out the one-time sale to NAIT.
- Risk
- The City can sell land, but it can't make a builder build. NAIT bought 13 ha in 2019 with no deadline and hasn't built.
- Price
- Pathway B: $1, Kehewin's first choice. Pathway A: half the market value.
- Land
- All 14.42 ha. Kehewin builds and pays for its own roads and pipes.
- Homes
- 1,269, for about 2,184 people. 411 are below market. That's about 99 homes per hectare.
- Shops, offices, hotel
- Pathway B: 85,000 sq. ft. of retail, 110,000 sq. ft. of office and medical space, and a 180-room hotel. Pathway A starts with the housing-led part and leaves out the hotel and destination part.
- Community buildings
- About 300,000 sq. ft. for health care, daycare, a school, recreation, culture and the Nation's offices
- What the City gets
- A yearly fee equal to property tax, set in a services agreement
- How fast
- The City assumed most of Kehewin's buildings would go up between 2030 and 2045.
- Park
- The City would have to replace the 1.02 ha of park somewhere else in Blatchford.
Sources: IS03188 cover report and Attachment 3; Kehewin business case (Attachment 2), sections 6.0 to 6.3; City Auditor's Blatchford audit (2024); City Blatchford land listings.
3How the money comes inLand sales, property tax and fees by year, and how later money is discounted.
Money to the City each year, before adjusting for when it arrives. The land money shows up as a bump while the City is selling. Tax builds up as buildings go up. Move the slider to change when the City starts selling.
Table: money by year
Money in later years is discounted 3% a year
The model takes 3% a year off money that arrives later, after inflation, so every total on this page is in today's dollars. The City hasn't published the rate it uses for Blatchford. You can change it in the assumptions.
4How sales pace and servicing costs change the resultThree steps from the City’s 2022 plan to the actual pace after costs.
Step 1 uses the City's 2022 plan. Each step after that swaps in one number from the City Auditor or the City's cost figures, and keeps the steps before it.
Table: every step
Two assumptions the model does not use: new business and build time
The effect is for the proposal as submitted, with everything else as it's set now. A plus means it would help Kehewin's case.
5What-ifs: deal terms and what each one is worthTerms Kehewin has not offered, and what each one would be worth to the City.
More homes close the gap
How the City does at each number of Kehewin homes, with the park kept on site. Above the zero line, the City does better than selling the land itself.
6Challenges and opportunities for each optionFor each option, from the report, Kehewin’s letter and other urban reserves.
Nothing moves without a Council motion.The report is for information only. Kehewin's letter says that without a motion the process ends here.Sources: IS03188; Kehewin Cree Nation letter to councillors, November 2026
Making the land a reserve is a federal process that has taken years.Canada's 2013 figure was five to seven years on average. Canada updated the policy in 2016 and made interim changes in December 2024. Naawi-Oodena in Winnipeg became a reserve in December 2022, after a legal fight that began in 2007.Sources: AANDC, 2013 · ISC interim measures, 2025 · CTV, 2022
A municipal services agreement has to be negotiated.It sets the fee and what services the City provides.Sources: IS03188; City Urban Reserve Strategy (2021)
Changing the Blatchford plan takes at least 6 to 9 months.Source: IS03188 Attachment 3
The energy utility's connection bylaw doesn't apply on reserve land.Connection has to be written into the agreement.Source: IS03188 Attachment 3
Kehewin's timeline and financing aren't set yet.The report says the timeline, financial feasibility and financing plans haven't been provided. Kehewin's letter says it can't pay for full due diligence until it has a clear path to the land, and that it's ready to make that investment if Council supports it.Sources: IS03188; Kehewin Cree Nation letter to councillors, November 2026
Edmonton has a strategy for this already.Council adopted the Urban Reserve Strategy in June 2021. The City signed memorandums of cooperation with Kehewin and the Confederacy of Treaty 6 First Nations in September 2021.Sources: Urban Reserve Strategy · Global News, 2021
Reserve land can be leased and borrowed against.A Nation with a land code under the First Nations Land Management Act can lease land and finance against the lease.Source: First Nations Land Management Act
First Nations have their own lender.The First Nations Finance Authority lends to member Nations for economic and social development. It is lending $194M for Enoch's River Cree expansion next door.Sources: First Nations Fiscal Management Act · CTV
Federal housing money for First Nations.CMHC's on-reserve programs are open to all First Nations, including non-profit rental housing and insured loans backed by a ministerial guarantee. CMHC lent $1.4B to the Squamish Nation's Sen̓áḵw project in Vancouver.Sources: CMHC Section 95 · CMHC insured loans
Edmonton's first urban reserve.The Edmonton region has the second largest urban Indigenous population in Canada.Source: Statistics Canada
The City gives up the full land value.About $46.2M at today's asking prices. Blatchford is meant to pay for itself through land sales, and the report says a below-market sale will hurt the Blatchford business case. Kehewin's letter says the same.Sources: IS03188; City land listings; Kehewin Cree Nation letter, November 2026
863 fewer homes on this land.1,269 instead of 2,132.Source: IS03188 Attachment 3
The largest build to finance.About $320M for the housing and destination streams together, within a $500M+ vision.Source: Kehewin business case, section 6.0
The Market District's role could change.The report counts Kehewin's hotel and shops as business the Market District would lose.Source: IS03188 Attachment 3
The hotel, destination and jobs come early.A 180-room hotel, conference space and 500+ permanent jobs.Source: Kehewin business case
It's Kehewin's first choice.Source: IS03188 cover report
Kehewin pays for its own roads and pipes.The City doesn't spend on servicing this land.Source: Kehewin business case, section 6.3
Kehewin pays about $23.1M up front.Half the land value at today's asking prices. The report uses appraised value, which is in the private Attachment 4.Sources: IS03188; City land listings
No hotel or destination part.Pathway A starts with the housing-led part of the plan. The business case says other uses could follow, with no size or timing given.Source: Kehewin business case, sections 6.0 and 6.1
863 fewer homes on this land.Source: IS03188 Attachment 3
The City gets half the land value back right away.That money goes to Blatchford's budget at the start.Source: IS03188
Closest of Kehewin's two offers to even.At the actual sales pace, after servicing costs, it comes out ahead over 10 to 20 years. See section 1.Source: this model
Homes go in next to the LRT station first.Blatchford Gate station is finished but not open.Sources: Kehewin business case, section 6.1; Policy C539A
A what-if. Kehewin hasn't offered this.
Kehewin carries land payments while it builds.Each phase is paid for before it's finished.
The deal is more complex.It needs phase boundaries, payment dates and building deadlines written into the agreement.
Payments line up with building.Kehewin pays as each phase moves ahead, not all at once.
Deadlines protect the City.If Kehewin stops, the unbuilt land goes back to the City to sell. NAIT bought 13 ha in 2019 with no deadline and hasn't built.Source: IS03188 Attachment 3
A what-if. It depends on the City changing its own Blatchford plan.
Amend the Blatchford Area Redevelopment Plan.A bylaw with a public hearing. The report puts plan changes at 6 to 9 months at least.Source: IS03188 Attachment 3
Rezone Market District land for housing.Blatchford has its own special area zones, with retail streets in the Market Centre. Rezoning is a separate bylaw with a public hearing.Source: Zoning Bylaw 20001, section 3.40
The market needs study.The report says further studies would be needed to know if the market supports more housing elsewhere in Blatchford.Source: IS03188 Attachment 3
The homes come at the City's sales pace.Slower than Kehewin's build.
The land is beside an open LRT station.NAIT/Blatchford Market station.
No Market District commercial land has sold yet.Changing its use doesn't undo any sale.
Multi-unit housing in Blatchford gets federal help.The City uses Housing Accelerator Fund money to rebate district energy connection costs for multi-unit housing in Blatchford.Source: City of Edmonton, Housing Accelerator Fund
A what-if. There's no public information on whether Kehewin could or would build at this density. That's a question for Kehewin.
Almost twice the density.From about 99 to about 185 homes per hectare of building land, on top of the hotel, shops and community buildings. That means taller buildings and more parking and servicing.Source: IS03188 Attachment 3
About $227M more to build.863 more homes at the business case's $262,700 per home.Source: Kehewin business case; this model
863 more homes to rent or sell.Blatchford land sold at 1.1 ha a year in 2022 and 2023, not counting NAIT.Source: City Auditor, Blatchford audit (2024)
Meets the City's housing target for this land.2,132 homes, the same as the current plan.
Keeps the residential tax base whole.The same number of homes pays the same residential tax as the City's plan.
More homes next to Blatchford Gate station.The station is finished but won't open until ridership meets City policy.Source: Policy C539A
Federal housing programs.CMHC's on-reserve rental and loan programs could help pay for the extra homes.Source: CMHC
7Possible partnershipsEnoch, Treaty 6 Nations, and federal and private financing.
These are possibilities only. Any partnership would be for Kehewin and other Nations to decide.
Partners could share the cost and risk of a large build and bring in more capital. Nations in the Edmonton area are already working together on large projects.
Confederacy of Treaty 6 First Nations.The Confederacy represents 16 Nations. In 2022 its member Nations formed the Confederacy Investors Group to invest in large projects. In July 2026 it submitted an expression of interest to redevelop about 18 ha in Rossdale, with room for 2,500 to 4,000 homes.Sources: Daily Oil Bulletin, 2022 · Taproot, July 2026
Enoch Cree Nation.Enoch shares an 8 km border with Edmonton and signed an agreement with the City in 2017. The mayor at the time said an urban reserve, regional transit and joint tourism could grow out of it. Enoch is financing more than $1 billion of development on its own land. Enoch, Alexander, Alexis Nakota Sioux and Paul First Nation formed the First Nation Capital Investment Partnership to take ownership stakes in major projects.Sources: Edmonton Journal, 2017 · Canada Infrastructure Bank · St. Albert Gazette
Nations can hold a reserve together.Naawi-Oodena in Winnipeg is held jointly by seven Treaty One Nations.Source: Sagkeeng First Nation, 2022
More ways to borrow.The First Nations Finance Authority asked Canada to let partnership companies owned by Nations borrow from it. The regulations were expected in fall 2025.Source: FNFA budget brief, August 2025
What a partnership could bring.More Nations sharing the cost of due diligence and construction, a larger combined borrowing base, and the experience of Nations that have built large projects here.
8When each option pulls aheadPick an option and see the year it passes the City selling the land.
9Costs and benefitsWhat the City gives up, the deal term that answers each cost, and what it gains.
Each cost is paired with a deal term that addresses it.
10Value, sales timing, Blatchford’s budget and the energy utilityWhat each option is worth, when sales start, and two parts of Blatchford’s finances.
What each option is worth to the City
Pathways A and B are Kehewin's two offers. The better-terms deal is a what-if. Land money goes to Blatchford's budget. Tax and Kehewin's fee go to the City's operating budget. Striped bars are losses.
Table: value by option
When the City starts selling changes who comes out ahead
Blatchford's own budget if Kehewin pays for the land
Energy utility: how much floor space is hooked up
The utility's dollar figures are in Attachment 4, which is private, so this uses floor space instead.
11Jobs, housing and other benefitsConstruction work, permanent jobs, below-market homes and community space.
Three lists, so nothing is counted twice: the City's budget, the local economy, and the community.
The City's budget
Tax and Kehewin's fee added up year by year, before adjusting for when the money arrives.
Savings without a public dollar figure
Roads the City wouldn't have to build. Kehewin's 14.42 ha includes 2.65 ha of roads that Kehewin would design and build (business case, section 6.3). By November 2025 the City had spent about $167 million preparing Blatchford's land, roads, utilities and transit access (Wikipedia's Blatchford article, citing City updates). The share for this land is not public.
Blatchford Gate station. The station was finished in December 2023 as part of the $291 million Metro Line Phase 1. It has no opening date and will open once ridership meets Transit Service Policy C539A. In 2023, keeping it closed was expected to save about $2 million a year, including site security. Kehewin's plan puts about 2,184 residents, more than 500 jobs, a hotel and conference space beside it.
Energy utility. Kehewin's buildings would connect sooner and need 27% more cooling (Attachment 3). See the energy chart in section 10.
Land next door. People living, working and visiting on Kehewin's site add demand for the City's remaining Blatchford land and the Market District.
The local economy
Jobs and economic activity (GDP) from building Kehewin's plan, using Statistics Canada's numbers for Alberta. A person-year is one person working for a year.
Table: construction impact
| Impact | $320M (low end) | $500M (full program) |
|---|---|---|
| Jobs, direct (person-years) | 1,053 | 1,646 |
| Jobs, direct and suppliers | 1,551 | 2,423 |
| Jobs, including household spending | 1,835 | 2,868 |
| GDP, direct and suppliers | $207.7M | $324.5M |
| GDP, including household spending | $254.2M | $397.2M |
| Wages, including household spending | $152.5M | $238.3M |
Spending is split two-thirds homes and one-third other buildings, by floor area in the business case. The multipliers are in 2022 dollars. They were converted to 2026 dollars with Statistics Canada's Edmonton building construction price index (homes 111.0 vs 98.2; other buildings 113.4 vs 95.3).
Kehewin starts building years sooner than the City's plan
Current-plan homes use the same building cost per home as Kehewin's homes ($262,700). The current plan's commercial space is in the Market District and is not counted here.
The hotel, visitors and outside money
Hotel. Edmonton hotels were 62.2% full in August 2025 at an average rate of $164.70, and 56.2% full in November 2025 (CoStar). The average rate in January 2026 was $152.46. The model uses 60% and $160. Statistics Canada's Alberta multiplier for hotels and other traveller accommodation is $0.841 of GDP for every dollar of revenue, including supplier and household spending.
Visitors. Explore Edmonton reports that the average overnight visitor spent $670 in 2025, and that 75 business events brought more than $81 million in economic impact. Kehewin's conference space, cultural tourism and Indigenous market would add to that.
Outside money. Federal and provincial financing would bring money to Edmonton that would not come here otherwise. The Sen̓áḵw project in Vancouver received a $1.4 billion CMHC construction loan, the largest in CMHC's history, for about 3,000 rental homes. Kehewin could apply to Build Canada Homes ($13 billion over five years), Urban, Rural and Northern Indigenous Housing ($2.8 billion, Budget 2025), and the roughly $50 billion over 10 years for Indigenous communities in the 2026 federal budget. These amounts depend on applications and are not counted here.
The community
How the community figures were worked out
Supportive housing. At Home/Chez Soi, the largest Canadian trial of Housing First, found savings in shelters, health care and justice services. For people with high needs, the savings covered about 69% of a roughly $20,000 yearly cost, or about $13,800 a year. For people with moderate needs, they covered 46% of a roughly $14,500 cost, or about $6,700 a year. Across 125 supportive homes, that is $0.8 million to $1.7 million a year. Most of the savings go to the province and the federal government. Some go to the City through police and emergency services.
Need in Edmonton. Homeward Trust counted 4,697 people experiencing homelessness in September 2024. In 2025, 50.6% of people experiencing homelessness in Edmonton identified as Indigenous (Homeward Trust). About 6% of the region's population is Indigenous.
Buildings. Business case section 5.3 lists a health and wellness centre (40,000+ sq. ft.), daycare (10,000+), First Nations school (45,000+), recreation centre (100,000+) and arbour and sports space (50,000+). The agreement would set public access to shared spaces.
Park. Keeping the 1.02 ha of park in Eagle's Landing, open to the public, keeps it in Blatchford's park network without using sellable land elsewhere.
City decisions. Council adopted the Urban Reserve Strategy in June 2021 and passed the motion that directed this work on August 19, 2025.
Reconciliation, jobs, tourism and reputation
Reconciliation. Council endorsed the Indigenous Framework in February 2021. Its first commitment is to build on the Truth and Reconciliation Commission's Calls to Action, the MMIWG Calls for Justice and the UN Declaration on the Rights of Indigenous Peoples. Council approved the TRC Municipal Response Plan in 2022, adopted the Urban Reserve Strategy in June 2021, and passed the motion that directed this work in August 2025. Canada's UN Declaration Act commits the federal government to carry out the Declaration, including the rights to land and to economic development. An urban reserve built by a Treaty 6 Nation in the centre of the city turns those commitments into land, buildings and jobs.
Jobs and business. The Edmonton region's Indigenous population grew by 11,400 people, or 15%, from 2016 to 2021. That was the largest increase of any urban area in Canada (Statistics Canada). In 2025, off-reserve Indigenous unemployment in Alberta was 10.9%, against 7.2% for the province (Job Bank, Alberta economic scan). Kehewin's business case builds its 500+ permanent jobs around Indigenous hiring, buying from Indigenous suppliers, and Indigenous business ownership.
Social good. The report's gender-based analysis finds that urban Indigenous women, single-parent households, Elders, youth and Two-Spirit people face greater barriers to housing, health care and culturally safe space. It also finds that the proposal "delivers targeted, high-impact socio-economic benefits" despite having fewer homes (IS03188). In 2025, 50.6% of people experiencing homelessness in Edmonton identified as Indigenous (Homeward Trust). Eagle's Landing puts housing, a health and wellness centre, childcare, a school and cultural space in one place.
Tourism. Indigenous tourism added $1.3 billion to Canada's GDP in 2023, with 34,711 jobs in 2,757 businesses (Indigenous Tourism Association of Canada). The Conference Board of Canada and ITAC report that demand from Canadian and international visitors is still greater than supply (ITAC). ITAC's goal is $6 billion in GDP and 60,000 jobs by 2030. Edmonton is already drawing Indigenous tourism conferences (Business in Edmonton). A cultural destination with a hotel, conference space and Indigenous market on an LRT line would add supply where demand is not being met.
Reputation. Winnipeg said its Naawi-Oodena agreement provides national leadership for the social, economic and cultural prosperity of all peoples (CTV News). Federal research on Saskatoon found that its urban reserve made the city a major commercial centre for Indigenous businesses and entrepreneurs (Western Economic Diversification Canada). Edmonton has the second largest urban Indigenous population in the country and no urban reserve yet.
What urban reserves have done in other places
Saskatoon has eight urban reserves. The first was Muskeg Lake Cree Nation's, in 1988. The City charges a fee for services that is "the exact same amount as would be billed for municipal and library taxes." By 2004, Muskeg Lake's 33 acres, now McKnight Commercial Centre, had 350 people working in 37 businesses.
Winnipeg signed a development and services agreement with the seven Treaty One Nations in 2022 for Naawi-Oodena, the former Kapyong Barracks. At 160 acres, it is described as the largest urban reserve in Canada. The City provides the same services there as in the rest of the city.
Enoch Cree Nation, on Edmonton's western border. The River Cree Resort and Casino opened in 2006. Enoch has owned it outright since 2018 and is nearly doubling it, adding 240 hotel rooms and about 40,000 sq. ft. of event space by 2027 (CTV News). The First Nations Finance Authority is providing $194 million for the expansion. The Canada Infrastructure Bank lent $100 million for roads and services that open the way for more than $1 billion in commercial and residential development on reserve land, supporting up to 800 jobs (Canada Infrastructure Bank). Major development on reserve land beside Edmonton is already being financed.
When River Cree opened, the $178 million project drew more than 5,000 applicants for 700 to 800 jobs (Edmonton Journal via Indianz). Enoch's development corporation said 90% of construction spending would stay in the greater Edmonton area (Alberta Sweetgrass). In 2014, 22% of River Cree's staff were Enoch members (Global News), and most of the rest came from the surrounding region. The City and Enoch share an 8 km border. They have worked together under a 2017 memorandum of understanding, including a fire services agreement with Edmonton Fire Rescue Services and City mosquito control on Enoch land (City of Edmonton; FCM).
Vancouver. The Squamish Nation's Sen̓áḵw project is building about 6,000 rental homes. A $1.4 billion federal loan is paying for the first half.
12Where every number comes fromEvery input, where it comes from, and how the model works.
Every number the results use
| What | Number | Where it comes from | Whose number |
|---|---|---|---|
| Blatchford land for sale | 107 ha. The Blatchford website says 276 acres, about 112 ha. | IS03188 Attachment 3; blatchfordedmonton.ca | City of Edmonton |
| This land | 14.42 ha: 10.75 for sale, 2.65 roads, 1.02 park | IS03188 Attachment 3, Nov 26, 2026 | City of Edmonton |
| Homes | City's plan 2,132 (about 185 per hectare of building land); Kehewin's plan 1,269 (about 99) | IS03188 Attachment 3 | City of Edmonton |
| Kehewin's shops, offices and hotel | 250,000 sq. ft. that pays tax. The City lists 85,000 sq. ft. of retail, 110,000 of office and medical, and a 180-room hotel. | Business case section 5.0; IS03188 Attachment 3 | Kehewin; City of Edmonton |
| Share of that business the Market District would lose | All of it | IS03188 Attachment 3: 25% of Blatchford's expected shop and office demand, and one of two hotels | City of Edmonton |
| Kehewin's two offers | Pathway B: $1, full plan. Pathway A: half the market value, housing-led plan. | IS03188 cover report; business case sections 6.0 to 6.3 | Kehewin; City of Edmonton |
| When Kehewin builds | 2030 to 2045 | IS03188 Attachment 3 (the City's energy utility assumption) | City of Edmonton |
| Planned sales pace | 6 ha a year, so this land sells 2027 to 2041 | City NPV analysis, IIS01335 Attachment 4, Oct 12, 2022; 2042 finish date | City of Edmonton |
| Actual sales pace | 3.3 ha a year from 2019, when sales started, to 2023 (1.1 without NAIT), so this land sells 2027 to 2053 | City Auditor, Blatchford audit, April 2024. Later check: revenue was $95.7M at the end of 2023 and $107.0M at the end of 2024 (memos to Council, Nov 7, 2024 and Nov 28, 2025), about 2.6 ha of sales in 2024 at today's prices. | City Auditor; City of Edmonton |
| Years from sale to finished buildings | 3 | The same head start the City gave Kehewin: deal in 2027, first buildings in 2030 | Our choice |
| Land price | $1.74M an acre | City Blatchford listings: eight ready-to-build parcels, $14.32M for 8.23 acres | City of Edmonton |
| Share of the price the City keeps after roads and pipes | 72% | City NPV analysis, IIS01335 Attachment 4: $209M for roads and pipes against $756M in land sales | City of Edmonton |
| Land price growth | None after inflation | The City's 2022 plan assumed 3% a year before inflation. The Auditor found prices fell 0.6% a year. | Our choice |
| Assessed value per home | $315,500 | City open data, 2025 assessments: median of 4,737 condo units built in 2017 or later | City of Edmonton |
| Assessed value of commercial space | $333 a sq. ft. | Kehewin's $500M divided by 1.5M sq. ft. | Kehewin |
| Tax rates | Homes 0.0077419; business 0.0252216 | Bylaw 21442 (2026) | City of Edmonton |
| Kehewin's yearly fee | Same as property tax | IS03188; City Urban Reserve Strategy (2021) | City of Edmonton |
| Community buildings | About 300,000 sq. ft., no tax | Business case section 5.0 | Kehewin |
| How much less money later is worth | 3% a year after inflation | The City hasn't published the rate it uses for Blatchford | Our choice |
| What it costs the City to serve each building | Not counted | Same as the report. You can turn it on in the assumptions. | City of Edmonton |
Not used anywhere: Attachment 4 of IS03188, which is private; the energy utility's dollar figures; provincial education tax; the cost and delay of changing the plan. The two things we tested but left out are listed in section 4.
How the math works
The City sells the land. The City sells the 10.75 ha in equal pieces each year, at the pace you pick. Buildings go up 3 years after each sale. The 2,132 homes pay residential tax. Shops and offices the same size as Kehewin's pay business tax in the Market District on the same schedule. The City gets the sale price, or 72% of it if you take off roads and pipes.
Pathway B ($1), Kehewin's first choice. Kehewin pays $1. It builds 1,269 homes and 250,000 sq. ft. of hotel and commercial space between 2030 and 2045 and pays a fee equal to property tax. The City replaces the 1.02 ha of park with land it could otherwise sell.
Pathway A (half price), Kehewin's other offer. Kehewin pays half the market value when the land changes hands, 2027 in the model. It builds the housing-led part of its plan, the 1,269 homes, between 2030 and 2045. The hotel and destination part isn't included, so the model keeps the City's shops and hotel in the Market District on the City's schedule. The business case says other uses could come later in Pathway A, but gives no size or timing, so the model leaves them out. The park is replaced elsewhere.
What-ifs with better terms. These aren't part of either offer. Kehewin pays the chosen share of the land price for each phase, two years before it's finished. Kehewin pays for its own roads and pipes, so nothing comes off its payment. If Kehewin misses a deadline, the rest of the land goes back to the City to sell. Part of Kehewin's fee can go to Blatchford's budget until the land is paid for. That moves money between City budgets but doesn't change the total. The park stays on Kehewin's site. The Market District swap builds the missing homes in the Market District on the City's schedule.
Adding it up. Everything is in 2026 dollars. Money that arrives later counts for 3% less for each year it waits. Prices stay flat after inflation unless you change that in the assumptions.
Left out. Jobs and spending from construction are shown in section 11 but aren't in the dollar totals. Tax breaks for non-profit and supportive housing would apply either way, so they're left out of both. Kehewin's community buildings pay no tax, the same as schools, daycares and rec centres elsewhere in the city.
Checking the math. Every result on the page was worked out a second time in a separate program, and both give the same answers to the cent.
Cost of serving each building. By default, tax and Kehewin's fee count as pure income, the way the report counts them. The cost-of-services setting takes off the City's average cost of services for each dollar of assessed value, about 1.21 cents. Homes pay 0.77 cents in tax and businesses pay 2.52 cents, so with this turned on, homes cost the City more than they pay and businesses pay more than they cost. The City's Tax Levy Tolerance report says the same thing but doesn't publish the numbers.
Every option, side by side
Plus: better for the City than selling the land. Minus: worse.
§Sources
- City of Edmonton, Infrastructure Services report IS03188, "Urban Reserve in Blatchford," Executive Committee, November 26, 2026, with Attachment 3 (Blatchford Redevelopment Project Impacts) and Attachment 5 (Urban Reserve Policy Considerations). Land areas, home counts, energy load changes, Pathway A and B terms.
- Kehewin Cree Nation, Eagle's Landing Consolidated Public-Facing Business Case (Attachment 2 to IS03188). Program areas, $500 million+ investment, phasing.
- City of Edmonton, Blatchford Property Listings, accessed November 12, 2026. Eight multi-family parcels, 8.23 acres, $14.32 million in asking prices.
- City of Edmonton Open Data, Property Assessment Data (Historical), 2025 assessment year. Median of 4,737 condominium units in 113 buildings built 2017 or later: $315,500. Calculated for this model.
- City of Edmonton, Historical Tax Rates, Bylaw 21442 (2026). Municipal rates: residential 0.0077419; non-residential 0.0252216.
- City of Edmonton, 2024 Blatchford progress recap. Full development expected in 2042.
- Edmonton Journal via Yahoo News, "Blatchford gets ready to more than double homes," 2026. No land parcels left on the market to sell to home builders.
- Blatchford Renewable Energy, 2026 rates. Multi-unit charge $13.18 per kW of peak capacity per month.
- Edmonton Journal, "City's Blatchford targets lack proof, audit reveals," April 6, 2024. 2022 reforecast: land sales to 2042, $39 million profit.
- Statistics Canada, Table 36-10-0595-01, Input-output multipliers, provincial and territorial, detail level, Alberta, 2022 (released November 19, 2025). Table 18-10-0289-01, Building construction price indexes, Edmonton.
- CoStar hotel data as reported by Hospitality Net (August 2025), Hospitality Net (January 2026) and Hotel-Online (November 2025).
- Business in Edmonton, "The 2026 Tourism Flux," quoting Explore Edmonton: $670 average spend per overnight visit; 75 business events, $81 million impact (2025).
- Mental Health Commission of Canada, At Home/Chez Soi final report summary; McGill University cost-effectiveness findings.
- CBC News, October 31, 2024 (Homeward Trust count of 4,697). Homeward Trust, "Data That Makes A Difference" (2026), Indigenous share 50.6% in 2025.
- City of Saskatoon, Urban Reserve FAQ (July 30, 2026). Western Economic Diversification Canada, Urban Reserves in Saskatchewan. City of Winnipeg news release, June 8, 2022; CBC News on Naawi-Oodena. Indigenous Services Canada, Urban reserves.
- Office of the Prime Minister, September 6, 2022 (Sen̓áḵw financing). Daily Hive on the 2026 federal budget. CAEH Budget 2025 analysis (Build Canada Homes; Urban, Rural and Northern Indigenous Housing).
- City of Edmonton, Metro Line North (Blatchford Gate); Transit Service Policy C539A. CTV News, September 20, 2023 ($2 million a year).
- City of Edmonton, 2027-2030 Tax Levy Tolerance report (cost of services by property class); Property Tax Policy Discussion Paper (assessment base: $131.8 billion residential, $44.1 billion non-residential).
- Legislation and policy: City of Edmonton Urban Reserve Strategy (2021); Canada's Additions to Reserve/Reserve Creation Policy Directives; First Nations Land Management Act; United Nations Declaration on the Rights of Indigenous Peoples Act.